| Our pre-cast concrete division started
as a hobby of our Late Chairman Engr. Izhar Ahmed
Qureshi in 1960. At that time there was no pre-cast
industry, no supporting infrastructure, no tools
for jacking, form making, concrete compaction etc.
All this was developed by our innovative and committed
team of engineers and technicians. The current status
of the pre-cast industry in Pakistan owes a lot
to these innovative, hardworking individuals who
pioneered these developmental works. |
| |
 |
| |
At present we have nine
pre-cast yards covering almost the whole Pakistan.
More than 2,000 workers are working in these yards.
Ours was the first pre-cast manufacturing company
to get ISO 9001 certification.
Concrete is the most commonly available tested material
in Pakistan. Good quality raw material is abundantly
available in the vicinity of Islamabad e.g., Margalla
crush and sand. Skilled personnel and tools & plants
required for concrete production is available. |
| |
| Concrete
Advantages: |
|
|
| What is
Pre-Cast
Concrete? |
| “Concrete which is cast-in some
location other than its final position in the finished
structure”. |
| |
| Pre-cast Concrete Advantages: |
- Quality control
- Higher strength
- Economy
- Shorter construction times
- Fire resistance
|
- Longer spans
- Shallow construction depth
- Low Maintenance
- Attractive appearance
- Low noise transmission
|